EVENDALE, Ohio – GE has concluded phase 1 testing on its second XA100 adaptive cycle engine as part of the U.S. Air Force’s Adaptive Engine Transition Program (AETP). Phase 1 testing took place at GE’s Evendale, Ohio, altitude test facility and enabled GE to continue gathering high-quality performance data validating the engine’s transformational propulsion capability. Phase 2 tests will begin at the U.S. Air Force’s advanced testing facilities at Arnold Engineering Development Complex (AEDC) in the first quarter of 2022.
“Phase 1 testing allowed us to further characterize the operation of the engine and puts us in a great position to begin Phase 2 testing at AEDC,” said David Tweedie, GE Edison Works’ general manager for Advanced Combat Engines. “We continue to burn down risk with full-scale engine testing, which is why the XA100 is the lowest risk, most capable, and fastest approach to keep the F-35 a preeminent fighter platform for the long term.” Read more